GSP Stadium in Nicosia Cyprus 1996-1998

Design and deployment of Formwork  Solutions including :

  • Stepped slabs
  • Inclined slabs
  • Stadium Steps
  • Inclined beams 110 x 100cm
  • Cantilever  beams  7m  long  3.4m deep
  • Straight and circular fair face walls of Stadium and internally
  • Inclined walls
  • Circular ramp walls and slab  fair face concrete